KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  11-24-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Baffle-3

The major things done to baffle today were the cuts to open up a pass thru for the oil cooler and then the match hole drilling of the assembled parts of this left rear quadrant. I also cut some spacers 3.5" in length for the oil cooler bracket. Much anding and deburing was required and this meant assemble and take back apart etc.
The last pic was taken to show 1 of three holes that have interference with another part. This happened because of where I placed the oil cooler. Due to no instruction. I dont think its an issue yet but....
These parts are ready to be primered and rivited but the plans advise to hold off until fitting the cowl.
' style=

Left rear quadrant parts assembled cut and drilled

Left rear quadrant parts assembled cut and drilled

' style=

oil cooler spacers

oil cooler spacers

' style=

Problem rivit hole

Problem rivit hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.