KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  11-3-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Re position pitot tube penetration and misc.

I first took the front foot wells out and re drilled where the pitot line needs to go without interfering with the foot well. I ended up reinstalling the foot wells several times before i was done with it. Pitot tube now is cleanly run. I will need a 9/16 plug for the now vacant hole however. No biggie!

I then removed protective tape around edges of my switch console and screwed it in with #8 screws. I did use protective nylon washers to protect my fancy primer paint job!! Ha

I also installed the over sized washer I made yesterday from aluminum bar stock to the back of the gascolator on the left bolt since it didnt have a reinforcement as the right did.

Clecoed in the rest of the front seat ramp and reinstalled the front seat back rest for asthetics and then vaccumed out the interior.
' style=

Safe air bulkhead connector repositioned for pitot tube

Safe air bulkhead connector repositioned for pitot tube

' style=

Switch console screwed in

Switch console screwed in

' style=

Gascolator reinforcement washer installed

Gascolator reinforcement washer installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.