KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  10-13-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Adel clamps and wire bundling

Added two adel clamps called for in plans. They were a real ... to get to withh all the wire and brake lines etc in the way. I used safety wire to close the clamp so I didnt have the added burdon of trying to push the clamp closed with the nut which was barely reacable to begin with. This helped greatly. Just cut off the safety wire when done.

Finshed up some other conections and more routing

Zip tied up lots of loose ends and slack all along the brace. Added spiral wrap were I had wire laying against anything metal.

Still have the fuel level sensor to connect but I need some butt splices. Cant believe I ran out!
I also have the Hobbs meter to wire up before the wiring is complete behind panel
' style=

Adel clamp compressed with safety wire

Adel clamp compressed with safety wire

' style=

Adel clamp two added and wires bundeled

Adel clamp two added and wires bundeled

' style=

Wiring getting tied and clear of metal brace

Wiring getting tied and clear of metal brace

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.