KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  11-4-2012
Number of Hours:  1.25
Manual Reference:  
Brief Description:  Front maplight switch install

I decided I wanted the maplight switch to be accessable for wiring and maint too and thought the access plate was best place. Unfortunately I didnt think of this yesterday when I drilled the hole for the light. Ther is still room and will work fine.

I marked and drilled the 1/4 inch hole in the access plate as well as the 5/64 antirotation hole.
I opened up the hole in the bulkhead cover as large as I could. This allows room for both the light and the switch for easy wire and maint access

test fit and ok with it. Cleaned up the edges with file and sanding and then primered again

there are additional photos and post for today
' style=

Bulk head cover hole inlarged

Bulk head cover hole inlarged

' style=

maplight and switch installed in cover and  test fit

maplight and switch installed in cover and test fit

' style=

front side of access plate

front side of access plate

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.