KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-7A Builder's Log
' style=
Date:  6-11-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Landing light installation

I ordered the DuckWorks 100w round halogen light kit. Today I began by using the template to position the cutout for the light, then traced around the template with a Sharpie to mark the line. After drilling out a starting hole, I went to work with the snips and carefully cut to within about 1/4 " of the line. Then I used a rotary cutter to cut up to the the line and then filed the edges to straighten and smooth them. Finally, I used a ScotchBrite disk in my rotary tool to finish the edges. The next step was to attach the platenuts that hold the landing light bracket, then install the bracket into the leading edge. Enough for this session!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.