KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-7A Builder's Log
' style=
Date:  11-9-2014
Number of Hours:  3.50
Manual Reference:  
Brief Description:  More organizing

It was my goal to have the hangar completely organized this weekend, and aside from a dead label maker yesterday, I think I made good progress. Today I went out with fresh batteries and labeled everything I could find. In the end, I think I’m as organized as I’ll ever be.

The way the shop is now set up, I have a fabrication area where the drills, vises, saws, etc, are located. Between that and the airplane, I have set up an assembly area that has all of the fasteners and spare parts, along with an assembly table. And then I have multiple storage areas around the perimeter that I use for solvents, assembled parts, spare aluminum, etc.

It may look odd to some, but for me, it works. I think I’m ready to tackle some wiring now.
' style=

Finally...

Finally...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.