KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-7A Builder's Log
' style=
Date:  5-7-2016
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Electrical odds & ends

Spent a short session at the hangar organizing the installation of the backup alternator and putting the pitch servo in. The servo is attached by three AN3 bolts and safety wire secures the assembly. There are two guaranteed things when I safety wire something—first, there will be blood. And second, I will waste a fair amount of wire trying to get it right. Both happened today, and I left without finishing the job…
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.