KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-7A Builder's Log
' style=
Date:  10-1-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Misc finish work

I had hoped to get enough done today that I could contact the FSDO and schedule my airworthiness inspection. I’m close, but will probably need next weekend to finish up the laundry list of small tasks still remaining. I was able to accomplish the following though:
• Installed the shoulder harnesses
• Installed the passenger seat
• Temporarily installed the aft baggage bulkhead. This will come back out for fitting the Classic Aero bulkhead cover, but I needed to trim the bulkhead just a bit to clear the aft canopy support bolt.
• Removed all plastic from the canopy
• Attached the spinner with stainless screws and nylon washers
• Fitted the top and bottom cowls and checked for clearance from the spinner—good all around.
• Drilled out the right wing tie down fitting hole (for some reason I didn’t do that before putting the skin on) and installed the tie down ring.
• Final fitted the canopy latching handle, attached the spring and installed the assembly.
• Weighed both main gear (each one around 410 lbs, so right on target). I’ll have to bring my motorcycle jack out to raise the nose gear.
I really hope that next weekend is the one where I sign the logbook and declare the aircraft safe for operation. It won’t be long now.
' style=

Spinner installed

Spinner installed

' style=

Test fitting cowling and spinner

Test fitting cowling and spinner

' style=

Canopy is uncovered, interior going in...

Canopy is uncovered, interior going in...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.