KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-7A Builder's Log
' style=
Date:  9-20-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Battery box and cowl fitting

Today I finished up the battery box and continued work on the cowling. I have a feeling the cowling is going to be a challenge. The basic premise is this: two separate pieces of molded fiberglass are installed along the firewall and meet to form a perfectly round circle some three feet forward. Lots of opportunity for error, and there is no doubt I will be filling and sanding in a number of spots.

When I first attached the top cowling, I needed to trim about ¼” off of the right side, but now, no matter how I position it, it appears that the trimming was unnecessary. This is going to lead to an uneven gap in front, so I will likely have to add about ¼” of additional glass up front to even things out. Time will tell.
' style=

Lightening holes are done

Lightening holes are done

' style=

Battery box and relays installed

Battery box and relays installed

' style=

Initial layout for oil door

Initial layout for oil door

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.