KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  9-27-2010
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Fuselage Sides

This log entry accounts for time spent during the previous weeks working on the fuselage sides.

I was able to cut and shape all the diagonal braces for the fuse sides and glue the gussets directly on top of rht framework for the first assembly (left side), but I had to assemble the right side with T-88 only, and then remove the assembly from the jig in order to install the gussets. Although a little time consuming, it came out fine and the two sides were nearly identical.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.