Powered By Kitlog Pro v2.0
Air Camper Construction Log
Air Camper
Engine
9-14-2009
< Previous Log Entry
Next Log Entry >
Date:
9-14-2009
Number of Hours:
0.10
Manual Reference:
Brief Description:
Crankshaft Update
Got a call from Joe at Moldex today. He informed me that my crankshaft was broken at the 2nd journal. Looks like I'll need to locate another one.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Air Camper Home
All
Empennage
Engine
Fuselage
Instruments
Landing Gear
Metal Fabrication
Miscellaneous
Shop Prep
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.