KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  9-29-2009
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Drilled LE and Squared Wing Spars

Theresa helped me mark and drill pilot holes in my leading edge.

I clamped two straight edges to my spars an used the Tony Bengalis' method of eyebaling wing alignment. I also used a 4' level and plumb bob to check several edges before clamping the assembly to the jig. Ready to make some serious progress!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.