Powered By Kitlog Pro v2.0
Air Camper Construction Log
Air Camper
Wings
9-16-2009
< Previous Log Entry
Next Log Entry >
Date:
9-16-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Applied Urethane Coating
Applied polyurethane coating to ribs 28 and 29.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Air Camper Home
All
Empennage
Engine
Fuselage
Instruments
Landing Gear
Metal Fabrication
Miscellaneous
Shop Prep
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.