Powered By Kitlog Pro v2.0
Air Camper Construction Log
NX762R
Shop Prep
7-2-2016
< Previous Log Entry
Next Log Entry >
Date:
7-2-2016
Number of Hours:
1.50
Manual Reference:
Brief Description:
Hangar Prep
Having been away from the hangar for several months as I worked on fabric and paint at Ragtime Aviation and my house, The hangar required a little reorganization to get prepared to press on with the final stages of construction.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
NX762R Home
Category
# Logs
# Hours
All
661
1506
Cables and Control
13
23
Covering
64
122
Electric/Instruments
23
37
Empennage
7
48
Engine
61
198
Firewall Forward
13
19
Fuel System
16
20
Fuselage
58
153
Landing Gear
52
113
Metal Fabrication
76
176
Miscellaneous
40
94
Shop Prep
6
30
Tools
20
38
Wings
212
435
Copyright © 2001-2024 Matronics. All Rights Reserved.