KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  10-29-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Cooling System

With 2024-O sheet in the shop, I am able to start forming the cooling eyebrows out of the real material. I rolled the front edge around 3/32” aluminum welding rod, which makes for a nice leading edge on the intake.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.