KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-27-2013
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Engine Mount

Picked up my engine mount from William Wynne ay Brodhead. During the process of building my landing gear I found that fitting and welding metal tubing was not my favorite task. Perhaps it was the dificulty I had with fusing think wall tube to thinner wall tube using a torch, but whatever the case I didn't feel like struggling with the critical dimensions of the engine mount... so I left it the the professionals at FlyCorvair.com. This is a nicely constructed mount... glad to have this task checked off the list.
' style=





' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.