KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  7-4-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Carb Heat Cable

After cutting, drilling and shaping aluminum angle, I was able to trial fit the first engine control cable for the carb heat box. All cables and wiring will be installed prior to installing the fuselage sides so that proper routing can be determined while controls are easily accessible.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.