KitLog pro

Powered By Kitlog Pro v2.0

Jon Web Site
' style=
Date:  9-23-2006
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Fuel Tanks + Wiring

Finished installing fuel tanks, ran all the wiring, ran fuel lines and pitot tubing. Installed the left wing tip and strobe/nav light. Tested lights prior to installing them and closed up the wing tip. We wrapped all wires in sheathing wherever they ran through a hole to prevent chafing. We then cut out wing root skin.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.