KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
' style=
Date:  5-27-2006
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Elevator preparation

Assempled right elevator counter balance for right elevator, matched drilled and deburred. Assempled right elevator skeleton and clecoed to skin, match drilled and deburred. Comleted all preparation except dimpling which will be done after doing similar work on left elevator. Match drilled left elevator stiffeners.
' style=

Prep to match dril right evelvator

Prep to match dril right evelvator

' style=

Counter balance sub assembly

Counter balance sub assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.