KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
' style=
Date:  11-18-2007
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Firewall part preparation

Fabricated the 601-J angles. I have clearly come a long way since fabricating the attachment angels for the horizontal stabilizer, the first step in the entire construction process. That required several attempts and my first part reorder. The 601-Js went smoothly. Fit and match drilled all angels and gussets. Fabricated the F-601P spacers and F-601 stiffeners and match drilled to firewall, F-601A. Fit the F-601Js to assembly and drilled. One, the left one, slip out of place while back drilling causing the holes along the flange to intersect the flange. Made another part and match drilled. Deburred the F-6122-1 brake line bracket. Cut and laid out for drilling the F-601Z fuel pump doubler.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.