KitLog pro

Powered By Kitlog Pro v2.0

Jim's RV12 Build
' style=
Date:  12-3-2014
Number of Hours:  1.00
Manual Reference:  36-07
Brief Description:  

Steps 1-3
Right Side
Attach wheel fairings to wheel fairing brackets.
1. Final-drill #19 the U-00001B wheel fiaring aft and the U-00001A wheel fairing front to the U-00002 wheel fairing brackets.
2. Roughen the inside the of the U-00001A wheel fairing front and the U-00001B wheel fairing aft at the #19 screw locations. Clean. Coat the threads of the 8-32 screws with candle wax to prevent epoxy from bonding to them. Tape the U-00002 wheel fairinig bracket tabs to prevent the eopxy/flox mixture from bonding to them. MIx eopxy and flox to the consistency of peanut butter and build up the areas around the four screws on both forward and aft main wheel fairings. Apply enough epoxy mixture to create a recess when the brackets are pressed against, but not so much that the epoxy will capture the brackets. Attach wheel fairings to the brackets and to each other while mixture is wet. Check wheel fairing alignment.
3. Final-drill #27, 3 of the 9 evenly space #40 screw attach holes in the U-00001A wheel fairing front and U-000011B wheel fairing aft. Remove the wheel fairing front and wheel fairing aft when epoxy has fully cured.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.