KitLog pro

Powered By Kitlog Pro v2.0

Jim's RV12 Build
' style=
Date:  7-25-2014
Number of Hours:  0.50
Manual Reference:  12-09
Brief Description:  Tailcone

Steps 7-8
Checked the clearance between the F1294 assembly spar box cutout and the stabilator assembly spar box throughout the full travel of the stabilator assembly.
Checked the clearance between the F1294 assembly horn cutout and the rudder horn throughout the full travel of the rudder assembly.
Mark & trim any areas of interference within 1/8' of clearance

Sorry, but I don't have at this time pictures of the clearance.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.