installed brake line bulkhead fittings in fuselage fabricated and installed left and right fuselage brake lines installed and final drilled fuselage top bulkheads installed fuselage top skin and final drilled that skin installed shoulder harness fairleads on F-807 bulkhead final drilled shoulder harness anchors