KitLog pro

Powered By Kitlog Pro v2.0

JON'S WEB SITE
' style=
Date:  1-24-2011
Number of Hours:  9.50
Manual Reference:  
Brief Description:  landing gear

Aligned gear legs to be parallel to each other and perpendicular to fuselage longitudinal centerline
drilled all remaing gear attach holes
torqued all gear bolts
measured gap on attach brackets
gaps were .010 inches, required gap is .030
outboard attach brackets will need to be "machined" down and addtional .020 inches
removed landing gear
returned fuselage to upright position and attached construction legs to "false'"spars
' style=

Aligning gear legs

Aligning gear legs

' style=

brackets require

brackets require "machining"

' style=

ready for finishing

ready for finishing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.