KitLog pro

Powered By Kitlog Pro v2.0

RV-8 N605TT
' style=
Date:  7-10-2013
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Brake lines - fuselage - part 1

Fabricated the brake line segments that run through the fuselage. These start from the end of the flex line from the fwd baggage bulkhead and run outboard and then down through the gear towers to a bulkhead union at the gear attach points. This was a pita working down through the gear towers. Not sure Van could have design a more difficult area to work than those gear towers. Used the plans specified 3032 tubing.
' style=





' style=

this line shown hanging freely

this line shown hanging freely

' style=

looking down into gear tower

looking down into gear tower

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.