KitLog pro

Powered By Kitlog Pro v2.0

RV-8 N605TT
' style=
Date:  2-12-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  bulkhead holes in f804 channels

began drilling the pass-through holes on the port and starboard f804 bulkhead channels. the port is for the engine control cables and the starboard is for the electrical wiring harness. the holes are large and my unibit only goes to 3/4" so i'll have to enlarge these to full size later.

spent some time looking over the rest of the interior plans & drawings.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.