KitLog pro

Powered By Kitlog Pro v2.0

RV-8 N605TT
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-21-2007
Number of Hours:  1.00
Manual Reference:  
Brief Description:  QB fuse kit arrived

fuselage and finish kit arrived via partain shipping. is there any other to go than quickbuild????? the delivery arrived in two pieces - the fuselage and a finish kit crate. the fuse was jam packed with parts. it's amazing how tightly van's can pack up a crate or "fuselage crate". i was unhappy with one issue where they packed the tailwheel spring against a gear leg tower and it chipped and gouged the steel tower. it isn't terribly substantial, and i should be able to tough up the powder coating easily, but van's shouldn't let that happen.
' style=

...a canoe on the front lawn...

...a canoe on the front lawn...

' style=




' style=

the tailwheel spring gouged the base of the gear leg tower during shipping

the tailwheel spring gouged the base of the gear leg tower during shipping

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.