KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  10-7-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cowling & Access Door

Work continued on the cowling and its components today. The upper cowl initial spot putty filling was sanded, and the underside was prepared for adhering the backer plate in position. The backer plate was also prepared, epoxy applied, and it was clamped in position.

The remaining epoxy was filled with micro-balloons and applied to the edge of the access door to smooth its perimeter.

The spot putty that had been applied to the lower cowl earlier, was sanded and a second round applied. All the epoxy and spot putty will cure overnight before work continues.
' style=

Backer Plate Epoxied in Place

Backer Plate Epoxied in Place

' style=

Beefing Up Access Door Edge

Beefing Up Access Door Edge

' style=

Second Round of Body Work on the Lower Cowl

Second Round of Body Work on the Lower Cowl

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.