KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  6-26-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Engine/Fuselage/Battery Ground Provision

Grounding points for the engine, airframe, and battery were established. A ¼-20 threaded stud and jam nut were mounted in the lower left rear corner of the engine, and secured with high strength Loctite RC/680.

A Firewall ground pass-through was established just below the upper left engine mount bolt, using a ¼-20 stud.

A fuselage grounding stud was mounted through the upper left fuselage structure gusset. The powder coating was removed to insure a good electrical connection to the frame. This point is adjacent to the negative terminal of the battery.

All of these points will be connected with #4 AWG cable, to provide an intentional, robust, ground path.
' style=

Engine Ground Terminal

Engine Ground Terminal

' style=

Firewall Ground Pass-Through

Firewall Ground Pass-Through

' style=

Fuselage Frame Ground Point

Fuselage Frame Ground Point

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.