Brief Description: Completion of the Aft Elevator Control Tube
Today, the forward elevator push rod was cut to length, the end was assembled, drilled, and riveted to the tube, and installed with temporary fasteners.
The flap detent plate was slightly modified to clear a weld bead, deburred and cleaned, match drilled to the fuselage structure, and fastened with temporary fasteners.