Today, the right aileron hinge was match drilled to the aileron skin, then everything was disassembled, deburred, then clecoed back together for a final check before updrilling and dimpling.
All of the operations of the last two days were repeated for the left aileron.
Transferring the Aileron Hinge Holes to the Skin. Fixture Controls Vertical Offset.