KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  1-2-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Spar preparation

The spars arrived with 10 or 12 four-millimeter screws holding the assemblies together. In preparation for updrilling, to be sure everything was held closely in position through the process; I added additional 4-mm screws at six to twelve-inch intervals, for a total of about forty per spar.
' style=

Added screws prior to up-drilling

Added screws prior to up-drilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.