Number of Hours:  5.00
Manual Reference:  
Brief Description:  Disassembly for Transition to the Hangar

Preparation for the transition from the basement workshop to the Hangar continued today. The horizontal and vertical stabilizers were removed and set aside. The seat back was removed to be repainted following recent modifications.

The right main gear was removed so the upper end can be painted to match the interior. The opening in the bottom of the fuselage will be opened slightly to eliminate interference with the gear leg.