Powered By Kitlog Pro v2.0
Johns Web Site
Panther
All
11-16-2016
< Previous Log Entry
Next Log Entry >
Date:
11-16-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Wiring Provisions
Today was spent optimizing wire routing through the fuselage, and placing some of the longer wires.
Three, two conductor shielded wires were pulled from the back side of the radio to the audio panel (headphone jacks and audio in.)
Three wires were pulled from the back of the EFIS to the magnetometer mounting tray behind the baggage area.
The wire paths for the two autopilot servos were optimized and provision made for securing the wire bundles near the servo DB-9 connectors.
The insulation on both side skins was modified slightly to better hide fuselage wires.
No photos today.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Panther Home
Category
# Logs
# Hours
All
608
1973
A - Empennage
45
160
Auto Pilot
2
14
B - Spars
9
57
C - Wings
101
392
Canopy
34
116
Controls
12
26
Cowling
25
104
D - Aft Fuselage
28
90
E - Forward Fuselage
85
315
Electrical & Avionic
37
162
Empanage Mounting to
10
26
Engine Testing
6
22
F - Landing gear
7
15
Fiberglass
14
46
Final Assembly
34
115
Flight Testing
16
Fuel System
6
17
I - Engine/Prop
62
191
Jigs, fixt. & shop
6
10
K - Miscellaneous
8
19
L - Shop & Hangar
2
M - Jigs & Fixtures
6
10
N - Tips & Tricks
1
Paint
26
Seat
4
7
Seat
3
9
Wheel Pants
14
50
Z - Tools
5
Copyright © 2001-2024 Matronics. All Rights Reserved.