KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  12-6-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Completion of the Right Fuel Tank Mounting Prepara

The lever operated dimpling tool table (see log entry for 8-13-2014) was modified slightly to allow dimpling the row of rivets immediately behind the back panel of the fuel tanks. All of the tank rivet holes were dimpled, the spar flanges were updrilled then countersunk, and the rivet holes on the inboard end of the wing leading edge were dimpled. All the dimpling was done with the DIE-NQ die set.

The tank was remounted and the rivet holes were reamed to #30. The tank and its mounting features are now complete, but will be tested again with 1-lb. of air pressure, followed by a wet test, fully loaded with gasoline.
' style=

Updrilling the Tank Mounting Holes

Updrilling the Tank Mounting Holes

' style=

Dimpling the Tank Mounting Holes

Dimpling the Tank Mounting Holes

' style=

Attachment Preparation Complete

Attachment Preparation Complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.