KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  10-3-2015
Number of Hours:  3.75
Manual Reference:  
Brief Description:  Flap Assembly

Construction of the flaps began today. The protective plastic was removed from the right flap skin and its ribs. The ribs were deburred, then the centerlines of all their flanges were marked.

Both flap drive angles were cleaned up, deburred, then match drilled and clecoed to the drive ribs. All of the ribs were then match drilled to the right skin, and clecoed in position.
' style=

Drive Rib Assembly - Right

Drive Rib Assembly - Right

' style=

Right Flap

Right Flap

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.