KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  8-21-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Completion of the Aft Elevator Control Tube

Today, the forward elevator push rod was cut to length, the end was assembled, drilled, and riveted to the tube, and installed with temporary fasteners.

The flap detent plate was slightly modified to clear a weld bead, deburred and cleaned, match drilled to the fuselage structure, and fastened with temporary fasteners.
' style=

Elevator Components Clamped in Neutral Position.

Elevator Components Clamped in Neutral Position.

' style=

Completed Elevator Reverser Connections.

Completed Elevator Reverser Connections.

' style=

Flap Detent Plate Mounted in Position

Flap Detent Plate Mounted in Position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.