KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  3-25-2015
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Left and Right Wing Structural Preparation

Removed the left wing rear spar, deburred everything, and remounted the rear spar.

Aligned the left rear spar with the forward spar on both ends and clamped them in position to the wing assembly fixture, ready for riveting.

Inserted the conduit wireway into the left wing for a trial fit. Looks good. Plastic bushings will be added to the remainder of the ribs when ACE hardware replenishes their supply.

Elongated the bolt holes in the right wing forward rib stiffeners with the process previously described, for the left wing.

Updrilled, marked the centerlines, straightened, and added wire conduit holes through ribs 7 to 14 for the right wing today.
' style=

Inboard End of Wireway

Inboard End of Wireway

' style=

Larger View of Wireway

Larger View of Wireway

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.