KitLog pro

Powered By Kitlog Pro v2.0

Jim Helicopter Web site
' style=
Date:  9-26-2005
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Took Delivery of three Exec 162F kits

The truck arrived before 8:00am as did the rented fork lift truck. Don, Spenser and I unloaded the truck of all three kits and organized the boxes. We uncrated most of the big items. Oops, I managed to get the fork lift truck stuck before even the first box was moved.
' style=

3 Exec 162F kits arrived

3 Exec 162F kits arrived

' style=

Jim's 1st attempt to drive a fork lift truck. Let's hope I do better with the kit!

Jim's 1st attempt to drive a fork lift truck. Let's hope I do better with the kit!

' style=

Breaking down the airframe crate

Breaking down the airframe crate

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.