KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Jackie's RV-8 Project
' style=
Date:  12-14-2005
Number of Hours:  1.25
Manual Reference:  6-9
Brief Description:  L/H elevator preparation

Got the l/h elevator assembled to the point where the skin needs to be match drilled to the skeleton. Took a look at all those holes to drill and thought ... 'yep, tomorrow night'!!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.