KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Jackie's RV-8 Project
' style=
Date:  2-5-2008
Number of Hours:  3.00
Manual Reference:  8-54
Brief Description:  Horizontal Stab attachment

First thing I did tonight was check all the measurements and determine some extra ones. I was a bit concerned about the accuracy of my level so I re-checked and double-checked the fuselage levels before deciding to re-do them. When Jackie got home she helped me measure everything. First I read the tape, then her, then me again. After the three readings I checked over the numbers and decided we were good to go. I then drilled, clamped, marked, drilled and bolted as per the instructions, getting Jackie to again help me check the measurements at several points between drillings. Everything worked out well and we now have the horizontal stabilizer bolted in place. Vert stab next.
' style=

Measurements and levels

Measurements and levels

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.