KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Jackie's RV-8 Project
' style=
Date:  7-1-2007
Number of Hours:  2.50
Manual Reference:  8-27
Brief Description:  Drilling aft fuselage

Match drilled the bottom/floor skins. Match drilled the F-824 aft side skin to the F-887 upper longeron. This is where I noticed that for some reason I had forgotten to install the F-812 aft bulkhead assembly. God only knows how. A little fiddling and I got the F-812 installed and match drilled to the bottom F-828 skin and the finished the F-887 longeron drilling. A good day, though I felt sorry for the compressor having to go flat out most of the day. Check out the photo though: NO CLAMPS :-) Tomorrow night I'll see if I can finish up the drilling of the F-824 aft side skins to the bulkheads.
' style=

Fwd & mid side skins, belly skins & F-887 upper longerons drilled

Fwd & mid side skins, belly skins & F-887 upper longerons drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.