Completed the drilling of the l/h elevator tip and pop rivetted in place. Made up some 020 Al strips for the r/h elevator tip, primed, bonded in place, and then riveted that tip on too. Final finishing of the counterweight ends and the fibreglass I'll do later on in the project. Much later!!