KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Jackie's RV-8 Project
' style=
Date:  10-14-2005
Number of Hours:  3.50
Manual Reference:  6-3
Brief Description:  Priming & rear spar assembly (r/h side)

Had another go at priming tonight with the new gun. I'm still not happy about it and would describe the results as decidely adequate. Nevertheless, it will do, and I'll seek some additional assistance from Bruce when I do the left-hand side bits, assuming he is willing. I had my spray cans of etch-primer arrive from Aeroware today, along with one or two other things, like temporary assembly pins, rivet cutter and the all-important altimete wall clock! Also had a few more clecos arrive from Avery, and importantly the new L/H horiz. stab. skin from Vans. I need to get that match drilled and dimpled this weekend, before Jackei goes to England for three weeks.Tonights work:- priming all the r/h parts. Rivetted the HS-411/VA-146 bearing assembly. Rivetted the HS-609PP reinforcing bars to the HS-603PP r/h rear spar. Rivetted on the r/h HS-413PP and HS-412PP brackets. I'll have a go at the ribs and front spar tomorrow and that will be the r/h skeleton done.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.