KitLog pro

Powered By Kitlog Pro v2.0

JoeNelsens Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-9-2013
Number of Hours:  6.50
Manual Reference:  
Brief Description:  axels

pix 1
just finished welding one axel for MLG.It was easy enough knowing a bit about gas welding, and had previously figured out the correcdt angle. It took a smaqll bit of gringing to get the head of the bolt to snugly fit in to the angled endo the tubing. final resule was very acceptable.

pix2
now that it is cold it needs to be cleaned up on the wire wheel. Not difficult, but must be protected from all the little flying wires from the wheel!

pix3
all done except for final paint. spacers made and installed as well as the nuts.
' style=

hot off mthe press!

hot off mthe press!

' style=

needs to be cleaned up

needs to be cleaned up

' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.