KitLog pro

Powered By Kitlog Pro v2.0

JoeNelsens Web Site
' style=
Date:  9-29-2014
Number of Hours:  5.00
Manual Reference:  
Brief Description:  LH done!

1) the back side of the spar with all the little pieces

2) sorry...repeat pix

3) One spar done and ready to go to storage...until I get the damaged one completed.

After these pictures were taken, I took some time off and have been gone for several week with family duties...other that building of course. The wife and I did have fun on out trips except for the really bad weather in Crossville at the ASA meeting. Cant call it a fly in as the wx was terrible. We had to stay a couple of extra days as the ling of storme was right acorss out direction fo travel. We would have run into in in Alabamb, Mississippi, Pousiana and probably Texas. so we stayed behind at the Bean pot campground, and were awakened at 0530 to the sound of the garbage compacting station oner the berm ratteling trash containers to beat the band. never saw or heard the racket when we arrived, but Sat, Sun Mon and Tue mornings were all active. So much for the Bean pot/ Nice enough otherwise. Used the metal detector and got 16 cents richer around the campsite. Ha...fount all the watter and electrical lines too!!

That is it for now. all family stuf done except for repaire to truck and trailer. anoither whole chapter in another blog!!
' style=

The other side

The other side

' style=

repeat?

repeat?

' style=

Done and ready for storage

Done and ready for storage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.