KitLog pro

Powered By Kitlog Pro v2.0

Jons Web Site
' style=
Date:  9-30-2022
Number of Hours:  2.30
Manual Reference:  
Brief Description:  main landing gear

Assembled landing gear strut and bracel Installed and drilled axles with inserts.
Assembled tires, rims, and brakes and installed on axle with self locking nut.
Wrapped shock cord 12 wraps times two per gear leg to cross member of fuselage and secured through provided loop with overhand knots and sealed ends with a torch.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.