KitLog pro

Powered By Kitlog Pro v2.0

Jons Web Site
' style=
Date:  12-27-2022
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Fabricated and installed pitot tube.

Bent pitot tube to proper angle.
Cut wood 2x4 and epoxied to nose cone.
Drilled and installed 4 stainless sheet metal screws through nose cone and into block.
Drilled angled hole to hold pitot tube.
Epoxied tube into block using tape to protect tube opening when inserted.
Installed tubing to pitot tube using push quick connects.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.