KitLog pro

Powered By Kitlog Pro v2.0

Ron's Web Site
' style=
Date:  10-12-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Plenum Cover Cracks

During oil change, at 285 hours, I found several small cracks in the plenum cover. I stop-drilled the cracks, and fabricated .032 inch thick 2024-T4 doublers, powder coated them, and riveted them in place. Additional cracks are likely to occur, and if I decide to rebuild the plenum, I likely will use .040 inch as the base material and incorporate similar doublers.
' style=

Left Side

Left Side

' style=

Right Side

Right Side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.