KitLog pro

Powered By Kitlog Pro v2.0

Ron's Web Site
' style=
Date:  7-13-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fabric Preparation

I installed the VOR antenna and aft static port tubing, side stringers, and reinstalled the fuel lines, then took the fuselage outside for a pressure wash, as 2 years of dust had accumulated since the fuselage was delivered. I then hoisted the fuselage up on a pulley system that I'd attached to the rafters of the shed, removed the landing gear and mounted the fuselage on the rotisserie, which will help with the fabric process. I then reinstalled the upper stringers and the skylight sheet metal.
' style=

After pressure washing.

After pressure washing.

' style=

Fuselage remounted on rotisserie.

Fuselage remounted on rotisserie.

' style=

Skylight remounted.

Skylight remounted.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.